Sound Company
Music Matters Productions (Stages 1, 2, 4)
Venue
Central Park
Atlanta, GA
Crew
- FOH Engineers: Grant Robinson (Stage 1); Huston Herron (Stage 2); Will Correll (Stage 4)
- Monitor Engineers: Tom Smith (Stage 1); Jon Summers (Stage 2); Gordon Ritchie-Haughton (Stage 4)
- Production Managers: Aaron Soriero; James Morris
- System Techs: Greg Thoren, Max Jones, Eric Guyton, Paula Hernandez Coral, Clayton Klein
Gear
FOH
- Consoles: Stage 1: Avid S6L-24D-144; Stage 2: Avid S6L-24C-112; Stage 4: Avid S6L-24C-112
- Speakers: Stage 1: (32) d&b audiotechnik J8, (8) d&b J12, (22) d&b J-Sub; (8) d&b J-Infra; (8) d&b V10P; Stage 2: (16) d&b J8, (8) d&b J12, (16) d&B J-Sub, (4) d&b J-Infra, (4) d&b Y10P; Stage 4: (8) d&b J8, (8) d&b J12, (12) d&b J-sub, (2) d&b Y10P
- Amps: Stage 1: (37) d&b D80; Stage 2: (18) d&b D80
- Processing: Custom MMP d&b FOH drive rack (all stages)
- Power Distro: (3) EMG 12 Way audio distro
- Rigging: (18) CM 1-ton motors
MON
- Consoles: Stage 1: Avid S6L-24D-144; Stage 2: Avid S6L-24C-112; Stage 4: Avid S6L-24C-112
- Speakers: Stage 1: (12) d&b audiotechnik M2, (2) d&b B2; Stage 2: (12) d&b M4, (2) d&B V-Sub; Stage 3: (12) d&b M4; (2) d&b V-sub
- Amps: Stage 1: (6) d&b D80; Stage 2: (3) d&b D40 Rack
- Mics: (18) Shure Axient with SM58 Handhelds; (3) Shure/Sennheiser/Audix/Radial festival mic packages
Event Details
Since getting its start in 2013, Shaky Knees has presented a diverse lineup ranging from well-known acts to up-and-coming artists. More than 60 acts performed on the various stages for the 2023 event. Music Matters Productions provided full production support to stages 1, 2 and 4.