Sound Co
Sound Works Productions
Venue
Cobb Great Hall, Michigan State University
East Lansing, MI
Crew
FOH Engineer: Matt McWilliams
Monitor Engineer: Brian Rutter
Production Manager: Daniel Nickleski
System Techs: Alex Lee, Steve Blaski
Gear
FOH
Console: Midas PRO2
Speakers: Nexo Geo S12
Amps: Nexo NXAmp4x4’s
Power Distro: Entertainment Metals
Rigging: CM
Breakout/Snake Assemblies: Entertainment Metals
MON
Speakers: EV X Line
Amps: QSC PL380 Powerlight
Processing: XTA
Mics: Shure, Sennheiser, Audix
Event Details
All Time Low performed March 27 in 2,420-capacity Cobb Great Hall within Michigan State University’s Wharton Center for the Performing Arts. The band, formed in 2003 near Baltimore, MD, has been touring consistently on their own and on the Warped Tour along with major festivals such as the Reading and Leeds festivals in the U.K.