Sound Co
Digital Sound Systems (DSS)
Venue
Providence Medical Center Amphitheater
Bonner Springs, KS
Crew
- FOH Engineer: Matt Lawrence
- Monitor Engineer: Freddie Johns III
- Systems Engineer: Jeff Pickman
- Production/Tour Manager: Mark J. Hetrick
- System Tech: Mace May
Gear
FOH
- Console: Allen & Heath dLive S-5000 Surface, dLive DM-32 MixRack
- Speakers: L-Acoustics K1 w/ Kara (mains), K2 (outfills), ARCS II (front fills), SB28 (subs)
- Amps: L-Acoustics LA-8
- Processing: L-Acoustics, DLP
- Plugins: Allen & Heath dLive
- Power Distro: Motion Labs
- Rigging: CM Lodestar (2-ton, 1-ton)
- Breakout Assemblies: Whirlwind
- Snake Assemblies: EMG RamLatch, TMB ProPlex
MON
- Speakers: L-Acoustics X15 HiQ, K2 (sidefills), K1-SB (sub), SB18 (drum sub)
- IEMs: Shure PSM1000, Shure SE315 generic ears
- Amps: L-Acoustics LA-8
- Mics: Shure UR2 handheld with a Telefunken M81 capsule
Event Details:
Staged Sept. 8-9 at Providence Medical Center Amphitheater, a.k.a. Cricket Wireless Amphitheater and the Sandstone Center for the Performing Arts, the lineup included Foster the People, Snoop Dogg, Weezer, Spoon, Gogol Bordello, Run The Jewels, Marian Hill, Toadies and more.