Skip to content

Christmas at Gaylord National

Share this Post:

The holiday-themed spectacle returned to the resort and convention center’s 19-story atrium from Nov. 26 to Dec. 31.

Sound Company

Showtime Sound LLC

Venue

Gaylord National Resort & Convention Center

Fort Washington, MD

Crew

  • FOH Engineers: Josh Cornell, Brandon Daus
  • Systems Engineer: Matthew Fox
  • Production Manager: Brian Linnemann
  • System Tech: Marc Chauvin

Gear

FOH

  • Console: Avid S6L 16C
  • Speakers: L-Acoustics Kara, SB18
  • Configuration: Mains (L-R): 5 Kara over 1 SB18/side (ground stacked); Delay (LCR): 1 SB18 over 7 Kara per hang (flown)
  • Amps: L-Acoustics LA12X
  • Processing: L-Acoustics P1
  • Power Distro: Whirlwind PLM

MON

  • IEMs: Shure PSM1000 (6 total)
  • Mics: Shure ULX-D